EN60598-1:2004
& ~0 ?/ a+ m- V1 @7 m4.9.2 Insulated linings, sleeves and similar parts shall have adequate mechanical, electrical
- C( l& R7 j! I" p# Tand thermal strength.) B z( z& W9 u
Compliance is checked by inspection, by manual test and by the electric strength test in+ h6 T5 p1 r0 Y" S4 U; Q0 R
accordance with section 10. The thermal properties of wire and sleeve are checked in
0 R$ K4 p$ _4 Z$ x/ [accordance with section 12. Heat resistant sleeves used as covering for wires attaining a
" l- U( o( \: M+ X6 k6 ]; rtemperature exceeding the values given in Table 12.2 of section 12 shall comply with the
, q: C4 s: q' i2 G. erequirements of IEC 60684, taking into account the temperature measured on the wire in
6 K+ ~ I" P; T7 f9 G! ?question. The sleeve shall be resistant to a temperature exceeding the temperature
: |' H4 i% J" i0 f: Xmeasured on the wire by 20 °C or withstand the following test:5 R9 U, i6 X. z1 Z$ h( W1 ]& J( F
a) Three test specimens of the sleeve, about 15 cm in length, are subjected to the humidity- `" i# q/ m% S! ~1 q2 ^
test of 9.3 and subsequently to the insulation resistance and electric strength tests1 G1 x7 ^0 g! v" t/ o: }
according to section 10. A suitable uninsulated copper conductor or metal rod is passed
: _2 Q5 I) J! G6 Q, T rthrough the specimens, and the outside is covered by a metal foil in such a way that no
$ Y5 b& G2 Q& S$ ?flashover at the ends of the samples can occur. The measurement of the insulation
6 N! W" E4 u. L% p Q; cresistance and the electric strength test is then made between the copper
?5 S. E- [5 v, [# Vconductor/metal rod and the metal foil.
7 b6 \4 U2 y9 }7 p, u3 xb) After the copper conductors/metal rods and metal foils have been removed, the4 k* ?/ U# q/ T+ r0 _$ R+ G# ]
specimens are placed in a heating cabinet for 240 h at a temperature of T + 20 °C,: ^" [" {0 j( k B7 ^1 F
T being the measured temperature of the wire.0 w$ l; w6 J6 ^, m/ K8 S
c) The specimens are allowed to cool to room temperature and are then prepared as! Z, C- |! `& d# W
indicated under item a) above.
* W4 y. E! `1 {% ]Measurement of the insulation resistance and electric strength is then made between the' d. p4 z v6 |1 y
copper conductor/metal rod and the metal foil.1 k' B3 ~& S. _: b
Compliance is checked by the insulation resistance values and test voltages specified in
8 K& k9 `& @ p* N( V, u8 q6 @: pTables 10.1 and 10.2 in section 10.) W5 Q, E& e$ F- V
5 d, y* Z# d& {! a f4 S
问:是否只要套管的耐热温度高于电线实测温度20 °C,就不需要做电气强度测试。还是任何套管都要经过相应的电气强度测试,以满足Insulated linings, sleeves and similar parts shall have adequate mechanical, electrical,and thermal strength. |
|