直流侧可有可无,通过short test评估就OK;
& K- L3 G. A5 V! ^; a' W交流侧就看你设计了,要样机里没有,需在说明书中说明装机时交流侧用的外置Fuse的Rating,相关要求如下(IEC 62109-1):8 H& |' }6 y# ^) R4 S
- s" E" G: j+ Y6 e
4.4.4.5 Output short circuit& }1 Y& a& h1 U; p3 f
Each power output port of the PCE, and each section of a tapped output, shall be tested one; b, r. S$ n# `! S) F& B
at a time, to simulate short circuits in the load or wiring. Overcurrent protection devices as
# K# A* s' w: sprovided in the PCE or as specified in the installation instructions, shall be fitted during the! Z+ e* ?. q' G8 W
test. All other outputs are loaded or not loaded, whichever load condition of normal use is less+ I( U; f8 c5 n/ N
favorable." T+ ?: w* |+ J8 d" s' F' M
Testing is required to be performed on all combinations of terminals for the port under6 D7 `7 m- E2 B" N. a/ x
consideration, two at a time, including neutral and earth terminals, and one test with all
" i2 Q! Y7 b I) B2 p M# K. t, S+ mcurrent-carrying terminals of the port shorted together at once. Where analysis shows that the+ g# R2 s6 n( i8 U) x
test for one combination is representative of other combinations, tests may be omitted.. x+ p7 O" p, Y! U5 [( `
In addition to the requirements of 4.4.3, the short-circuit currents are to be recorded and if8 h8 Q2 ]9 j2 Y# p: f* [
they exceed the maximum rated current of the circuit, the maximum measured current shall be
" ?* h8 Q6 S- ^provided in the installation manual for the purpose of coordination of overcurrent protection of+ D, U0 l5 A3 f
the external circuit conductors (see 5.3.2).; N' F! g+ n$ n9 o# a3 O+ e( ~
The value(s) to be recorded and to be provided with the PCE instructions are the peak
7 T/ F2 g, o; @8 o4 J; Gcurrent, and the highest of the RMS current values measured or calculated over a time period
+ [4 l3 A5 c/ n, u2 ?as follows: \! J- c, g" _1 N6 v1 p
a) for AC signals, 3 cycles of the nominal AC frequency for the port under consideration, in
" f$ _! ~7 L0 A4 h; `$ vwhich case the value is to be stated as the 3-cycle RMS value;
+ l6 z9 J+ [" x2 s8 j0 Db) for all signals, the duration of the short circuit from the time the short circuit is applied, until
0 j; q0 M; ?6 l4 Kthe time the short circuit current is interrupted by a protective device or other mechanism, in2 I8 f3 D$ Y0 d) w+ K; }& d
which case the value stated is to include the RMS value and the time period in seconds;
8 X5 C/ S! X' t7 M6 dc) for short circuit tests that result in a continuous non-zero value, the steady-state RMS2 o1 j$ W: x$ t
value, in which case the value is to be stated as a continuous RMS value.; n! d0 \. o& Z6 q8 m5 t7 N8 l
NOTE Where the intended use of the short-circuit current information requires a different type of measurement,
+ Y( P3 H; G0 R0 l, @" j$ hadditional data may be provided. For example, for AC mains fault current contribution some utilities may prefer a# O( c# A1 b3 E* k
¼-cycle RMS or other RMS calculation to the 3-cycle RMS above. |
|