|
| PDSH 8894 R1 ?- X4 m( B
* {; l0 S& Y1 p( a | Through wiring in the luminaires. C! [( V- c/ e) Q" u/ A1 x, d
| 5.3.1 D6 X% F' {0 I* }
| 60598-1(ed.3);am1 & 60598-1(ed.4);am1 & 60598-1(ed.5) & 60598-1(ed.6);am1 & 60598-1(ed.7)5 R1 M! d, s( B, ?" V. p Z1 j/ I
| 2 N9 L2 t, P2 p3 ?% k- P+ [
Standard(s):( j# Z9 Z& c. b7 X) a
IEC 60598-1 All editions1 ` S* z& L7 B
Subclause(s): 5.3.1
; a% B4 }$ p. ]+ x K8 |6 l* L5 U& |No. Year DSH 0889 2010
4 w8 Y; j* s6 A6 BCategory: LITE Developed by: ETF5 OSM/LUM
9 z$ g! o! A6 u/ SSubject:
6 _% \- a) s ?5 vThrough wiring in the luminaires" g: L) b% U* i$ ?1 V' j; V; j7 x4 R6 `0 U
Key words:
' `8 K! V/ Y- i- Luminaire manufacturer
& ]1 m) {) x8 U n7 ?9 C7 [- Skilled persons% S+ K* b9 ^0 b/ G7 a$ i4 _' r3 D7 w
- Cable/wiring$ ^. \. c! ?/ Y+ J* O: l* f
Approved at the 49th CTL Plenary Meeting, in 2012
$ {" f3 x9 S- C/ A8 [Question:
9 D6 g) H' i: L$ mThrough wiring of luminaires doesn't need to be delivered with the luminaire, if the way of mounting is
1 S. |; |$ X# ~5 ^# w' M- Pclear from the manufacturer's instructions. However, if special cables or sleeves, e.g. due to high5 z, U8 H6 Y0 _
temperatures, are necessary, the through wiring shall always be factory assembled. The cables and sleeves0 y1 I" T, n1 O' {
have to be built-in in case of high temperatures. Is that example also applicable in case of special cables
! ^8 {5 S2 I& C) w(double insulated, normal temperature, </= 90°C) to fulfil the class II requirements?
+ d: [/ m# t9 L4 MDecision:# ?: R! Y2 v/ f( R; g H; a
Such constructions are acceptable provided that:0 `5 i0 q1 x8 D: w- k6 W
- the luminaires are assembled by skilled technical persons;* |8 b- K# H; J" f9 n
- the act of assembling is clearly described in the instructions;
8 E. M; B& A. q, {2 R; C2 C- the cable/wiring is delivered by the luminaire manufacturer only.6 I, z* g. w4 U/ _5 K$ ~* h! `
& I) y6 r: B& `8 Y( s
3 W g& B+ e% v, @8 n |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?注册安规
x
|