|
1.2.2.1 MAXIMUM OUTPUT VOLATGE,CURRENT, AND VOLT-AMPERE MEASUREMENT TEST* `: E- B; ?* G+ e1 ^1 A
1.6.2 INPUT TEST:SINGLE-PHASE% @& Y0 z5 S R/ q
2.2.2,2.2.3,2.2.4 SELV RELIABLITY TEST
+ b3 T% H( Q, \2.4.1,2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS
6 h% Y. F+ m4 w$ k0 B9 `2.5 LIMITED POWER SOURCE MEASUREMENT
( r# k4 V6 {& \5 t" ]$ H% p2.9.2 HUMIDITY TEST8 M2 P$ K0 W, f0 ^/ n9 k5 I
2.10.2 DETERMINATION OF WORKING VOLTAGE
: s7 y7 {- ~$ t% u9 X3 g2.10.2.6,2.10.5.13 TRANSFOEMER AND WIRE INSULATION ELECTRIC STRENGTH TEST: N, G: H, |* C; } t
3.2.6,4.2.1,4.2.7 STRAIN RELIEF TEST
0 T) F9 t' \$ H' B5 o$ A5 X4.2.4 STEADY FORCE TEST5 g2 E) q" v+ m8 F# |, J3 u* H5 `
4.2.6 DROP TEST
9 f5 u p/ a, k- ?4.2.7 SRESS RELIEF TEST& q. s9 U5 ?& ~$ V1 V# B a1 q' f
4.5.1 HEATING TEST
3 c6 ]! R4 f: J4.5.5 BALL PRESSURE TEST1 x0 ]- S/ c& Z: x4 ~. R
5.1 TOUCH CURRENT; ?- g* O& i$ W) x
5.2.2 ELECTRIC STRENGTH TEST
+ N4 p5 c+ ^4 S. w0 `2 T6 k5 I5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST
6 D: b: [7 k8 s5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST& `3 [: h$ G8 J B# L
5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST 3 ?9 I' e$ o8 R$ q) P1 \6 D
我这是参考UL60950-1 ,有不全或者错误的地方请指正。 |
|