|
澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。* Q& D8 L+ l; a n) [! J
由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。
# g8 e' \; ?% ?) S$ T. J; l7 z$ z6 o
; u, z3 f8 e0 h, a! J1 g内容如下,大家可以探讨一下:( e% [9 O: {/ u5 M' b& {: Z
7 o8 ^ \# ^+ K; M: Y
22.113 Replace the text by the following.
( N$ K+ O% D7 R! @" j8 c3 ]3 LToasters having an ejector mechanism shall be constructed so that they switch off
4 Y7 k# H" W( fautomatically after the normal toasting time even if the ejector mechanism is
6 |: X! {- O0 c ~! X; s9 A' Iblocked by the bread.
I$ o o% q- G" _Furthermore, toasters having an ejector mechanism shall be constructed so that
) R+ ]3 Z/ o6 |they switch off automatically after the normal toasting time even if the operating
; W' d/ u, A* A% B$ Y3 {lever is held down. This requirement is not applicable to toasters having an ejector; `9 C6 E6 S: r/ j. |
mechanism if the operating lever is recessed so as to avoid it being inadvertently" G* N1 O* g4 Z1 Z
held down by a vertically moving roller door or the like.) |8 @2 F' |! v" N% X
Compliance is checked by inspection and by the following tests for ejector
5 Z$ D4 I! b/ z. n# Kmechanisms blocked by the bread and for toasters not having a recessed operating3 @8 E6 s3 l8 `8 J5 v) A2 |
lever.; W6 S& H0 _' P. ^) Y
The toaster is supplied at rated voltage and the ejector mechanism is prevented
6 ^/ O8 f3 O' n% X+ tfrom releasing. On the completion of the normal toasting time, heating elements
: W7 z% }, W$ K, J* Mshall be automatically disconnected from the supply by at least an all-pole
9 e0 ^+ F5 h$ o- r1 B( Zdisconnection, micro-disconnection. However, a single pole, micro-disconnection
`) Q; d3 l, g4 M qis allowed, provided heating elements are not accessible to the test probe 12 of IEC h! V* q& y6 _3 p1 e5 ]
61032.
# h6 l0 G( ?7 i$ j) v/ PFor toasters not having a recessed operating lever, the test is repeated, the+ G1 V; b& @8 t6 B, F$ D! N
toaster being supplied at rated voltage with the operating lever prevented from
! @0 R$ W7 Q, E1 _releasing. On the completion of the normal toasting time, heating elements shall be
5 ]6 e5 y3 i8 j/ |- |8 o- r. Tautomatically disconnected from the supply by at least an all-pole disconnection,
/ p& X' w ` Z6 n8 mmicro-disconnection. However, a single pole, micro-disconnection is allowed,
' T1 C! O4 J$ H; Qprovided heating elements are not accessible to the test probe 12 of IEC 61032. |
|