|
澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。! h7 _8 [9 K, N9 U' C* K* |) o
由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。
1 H) e( ?1 @% b7 P! F/ |5 t& D. v( ?8 v5 f2 T
内容如下,大家可以探讨一下:( ?) G* Q) f7 `: v- @2 R) l
( k, u/ R' F/ ?# [5 t7 g! c
22.113 Replace the text by the following.
1 H! F+ u% u- `Toasters having an ejector mechanism shall be constructed so that they switch off1 O) o: H7 k; F" r
automatically after the normal toasting time even if the ejector mechanism is: x& N% e0 n; X* z, ~5 n
blocked by the bread.! y. s, t/ t+ y0 O: M2 H! o! X
Furthermore, toasters having an ejector mechanism shall be constructed so that
O( p6 E0 ]9 i8 N3 {" N8 N& R% Y4 Ethey switch off automatically after the normal toasting time even if the operating
6 _) T! u9 r+ p w2 @9 Elever is held down. This requirement is not applicable to toasters having an ejector
, O' i8 B4 y+ B' j1 y. qmechanism if the operating lever is recessed so as to avoid it being inadvertently$ Z) u' ]4 S, d- J2 M
held down by a vertically moving roller door or the like.
; S4 l. v) n2 M- {! k# J3 OCompliance is checked by inspection and by the following tests for ejector
. o; N. u7 v: r" O% pmechanisms blocked by the bread and for toasters not having a recessed operating
. S9 h2 M: r, f( Vlever.
4 c# ^) c/ E% ~6 A1 R* ^, M- LThe toaster is supplied at rated voltage and the ejector mechanism is prevented
( }) o: ~6 F) b- E4 hfrom releasing. On the completion of the normal toasting time, heating elements
6 W( N* |9 t+ Jshall be automatically disconnected from the supply by at least an all-pole& Z/ B+ t2 A8 h( w
disconnection, micro-disconnection. However, a single pole, micro-disconnection3 J" \+ x+ r( N- G5 _4 e
is allowed, provided heating elements are not accessible to the test probe 12 of IEC
2 a' e9 z# Y- a61032.
4 o% ]( M8 b& F/ z; w3 pFor toasters not having a recessed operating lever, the test is repeated, the0 y$ j: s2 p4 s7 Q6 k
toaster being supplied at rated voltage with the operating lever prevented from! j( Z7 Y! i v4 ]3 }: r
releasing. On the completion of the normal toasting time, heating elements shall be5 a$ G$ j+ k4 G* ^2 Z
automatically disconnected from the supply by at least an all-pole disconnection,: Y, j, B d2 B
micro-disconnection. However, a single pole, micro-disconnection is allowed,
/ t9 z' t* y; ?) B/ ]" Rprovided heating elements are not accessible to the test probe 12 of IEC 61032. |
|